A written representation has been made to the executive engineer of irrigation circle Bhuj, alleging that the dam is under construction at Kuran in Bhuj taluka at a cost of Rs 9 crore, which is of poor quality. Jalubha Mansangji Sodha of the village said in a representation that since the country got independence, Kuran village has been struggling for drinking water and many families have migrated from this border village due to lack of water. The work of constructing the dam at a cost of Rs 9 crore is going on in the village. The work is of light quality. Instead of being filled together, it is done piece by piece. There is no measure of cement in this operation in the dark. He has also raised questions about the quantity and quality of iron. Even if a prominent local resident of the village goes and makes a representation about the quality of work, the dowry is not given. He has demanded an inquiry into the poor quality of work being done in connivance with the working agency and officials.
0 thoughts on “Presentation: The work of the dam to be built at a cost of Rs 9 crore in Kuran is of light quality.”
Leave a Reply
Your email address will not be published. Required fields are marked *
RECENT NEWS
- Fire broke out for the 7th time: Fire broke out again in jhuris in Oddar Ratanpar border
- Sowing: Despite the return of rains and the late onset of the season, 1497 hectares of sowing increased in the winter crop this time
- Shortage of Home Guard personnel: 154 Home Guard personnel reduced against 353 in Porbandar district home guard office
- Presentation: The work of the dam to be built at a cost of Rs 9 crore in Kuran is of light quality.
- Snow cover: Bone-chilling cold in The villages of Abdasa caused snow to freeze